Areas:
-
Steam Turbine Generator Performance
Guarantee Document
Review....
-
Performance Guarantee Testing Procedure Evaluations.
-
High Accuracy Instrumentation Recommendations.
-
Cycle Isolation Testing.
-
Test Uncertainty Evaluations.
-
Steam Turbine Generator Acceptance Test Data Evaluations.
-
Economic and Performance Contribution to Test
Inadequacies Consultations.
|
|
The following is a list
of some of the turbine types where ASME Power Test Code (PTC) work was
performed. In addition some other major turbine related work is
listed.
Major Support:
TURBINE ASME PTC 6.0
RELATED [H]-
-
Tandem
Compound Quadruple Flow (625 MW
Mitsubishi-Siemens). Evaluations based on ASME PTC 6.0 computations. Power / Efficiency Loss Evaluations.
-
Tandem
Compound Quadruple Flow Single Reheat (770 MW Westinghouse).
Performance Guarantees, Acceptance Testing. Full ASME PTC 6.0
computations.
OTHER
TURBINE RELATED PROJECTS AND EVALUATIONS
[H]:
-
Tandem
compound double flow single reheat (420 MW Westinghouse). Special
Testing and evaluations at Low Load and Low Pressures. Heat Balance Evaluations.
(See
Experience LP Operation)
-
Tandem compound double
flow single reheat (390 MW Westinghouse). Heat Balance
Evaluations.
-
Complete Heat Balance
Evaluations for turbine upgrade proposals.
-
Modification to turbine
and cycle impacts.
-
Sensitivity
Evaluations/Verifications and Correction Curve Equations.
-
Steam Path Audits.